Ana gezinime atla Aramaya atla Ana içeriğe atla

Precontract challenges: Two large system acquisition experiences

  • The Bilgi Group Ltd
  • Middle East Technical University

Araştırma çıktısı: Kitap/Rapor/Konferans Bildirisinde BölümBölümHakemli

2 Alıntılar (Scopus)

Özet

The acquisition of software-intensive systems demands significant work on requirements prior to establishing the contract. Two significant challenges of the precontract phase are the identification of functional requirements and the determination of an approximate budget. In this chapter, experiences gained from the implementation of a business-process-based requirements-elicitation approach to two large innovative military applications are presented. The requirements-elicitation process proposes the determination of the requirements of a software-intensive system to be acquired from the business objectives and defined processes. In addition to the details related to the requirements-elicitation process, management practices for coordinating the efforts related to the acquisition process and determination of costs are also discussed.

Orijinal dilİngilizce
Ana bilgisayar yayını başlığıEnterprise Architecture and Integration
Ana bilgisayar yayını alt yazısıMethods, Implementation and Technologies
YayınlayanIGI Global
Sayfalar51-73
Sayfa sayısı23
ISBN (Basılı)9781591408871
DOI'lar
Yayın durumuYayınlandı - 2007
Harici olarak yayınlandıEvet

Parmak izi

Precontract challenges: Two large system acquisition experiences' araştırma başlıklarına git. Birlikte benzersiz bir parmak izi oluştururlar.

Bundan alıntı yap