| Date of Award | 2024 |
|---|---|
| Original language | English |
| Supervisor | Bahtiyar Ünver (Supervisor) |
Numerical analysis of rock stability challenges actuated by the extraction of a crown pillar left between open pit and underground mine: A mine-specific investigation
Student thesis: Doctoral Thesis